GKR Scaffolding was the appointed scaffolding contractor for ISG on the Wandsworth River Quarter Project following the success on the Wandsworth Shopping Centre. The Scaffold Package included full external access scaffold to a 10 storey and 12 storey new build residential blocks on the Thames.
The main scaffold was constructed with the progress of the R.C Frame and then later adapted for the Stowe render and the window installation. Part of the scaffold to the Thames elevation was cantilevered from the existing building.
 |
 |
- 8,216.00 sqm of external main scaffold
- Full CAD design for all works
- Cantilevered scaffold to the Thames elevation
- Two Hoist Run off Scaffolds
|
 |
 |
|
 |
 |
|
 |
 |
|
|