
One of GKR Scaffolding's prestigious contracts which involved a major access scaffold to an existing 17 storey building in Euston Road. The first stage was to erect a de-clad scaffold with works later on being carried out on the existing theatre and a new 7 storey extension.
 |
 |
- 9,300 sqm of main scaffold to the main tower.
- 2,400 sqm scaffold to new extension.
- 4,800m3 birdcage to the new theatre.
- 4 lift shaft scaffolds.
- 3 cantilevered scaffolds to the rear elevation spanning over the new extension
- 2 Hoist Run offs.
- Over 6,000 metre of double guard-rail and toeboard protection.
- 300 sqm advertising screen support.
- 180 metres of heavy duty gantry scaffold.
- Temporary roofs to isolated areas.
- Cantilevered loading bays.
- Scaffolds to riser shafts.
|
 |
 |
|
 |
 |
|
 |
 |
|
|