GKR Scaffolding was appointed the scaffolding contractor on this complex project which involved an internal birdcage to an existing atrium, with an access scaffold to construct the new 8th floor extension and finally a link bridge between the two buildings at 3rd floor level spanning over a City of London carriageway.
 |
 |
- 8,000m³ internal birdcage to existing atrium erected and dismantled out of hours.
- 300 sqm HAKI temporary roof over atrium.
- Heavy duty support scaffolds.
- Internal liftshafts and risers.
- 40m x 14m gantry spanning over carriageway to support scaffold for new linkbridge.
- External scaffold to linkbridge including temporary roof.
- 80 metres of hoarding works to gantry.
- GKR scaffolding alarm system.
- Temporary lighting to scaffold.
- Close involvement with the City of London regarding road closures and traffic diversions.
- Full CAD design service.
|
 |
 |
|
 |
 |
- Interior Tolent joint venture.
|
 |
 |
|
|