The project was situated in the Centre of London, the existing building was to have an additional floor constructed. GKR Scaffolding provided the client with the latest scaffolding HAKI Roof System which was constructed on tracks and wheels to allow the roof to open to allow construction of the new steel frame at roof level.
GKR Scaffolding constructed all of these works with a short programme and have been highly complimented on the roof system, the main scaffold consisted of 3,680.00 square metres of scaffolding.
 |
 |
- Supply and dismantle a Rolling Haki Roof System
- Supply and install a 25.00m high Haki Staircase
- 3,680.00 of external main scaffold
- Full CAD design for all works
|
 |
 |
|
 |
 |
|
|